The full protocol

All ten steps,
on one bench.

Not every delivery needs every step. Suspect lots, brokered parts and aerospace orders can run the whole protocol; the depth of testing is agreed with you before we start.

01

Receiving inspection

Goods are checked in against their documentation, with traceability maintained from the first touch.

Full traceability
02

Detailed inspection

Microscope-level examination for oxidation, mishandling, foreign object debris and signs of re-tinning or re-balling.

Microscope exam
03

Mechanical inspection

Dimensions, markings and packaging compared against the manufacturer’s datasheet to separate genuine from suspicious.

Datasheet match
04

Acetone & scrape tests

Acetone-dipped swabs reveal surface changes; scrape tests follow when a part stays suspicious.

Surface truth
05

Heated chemical tests

Progressive destructive testing verifies surface composition and exposes remarking or resurfacing.

AS6081
06

RoHS verification

X-ray fluorescence analysis reads material composition and detects prohibited substances such as lead.

XRF analysis
07

X-ray

Die construction, lead frames and wire-bond layout inspected without opening the package.

JewelBox-70T
08

Solderability test

The dip-and-look method proves terminations will actually solder on your line.

J-STD-002
09

Decapsulation & die inspection

A high-temperature process retrieves the die for comparison against our internal database.

x2145 magnification
10

Baking

Moisture sensitivity levels are reset so the popcorn effect never reaches your reflow oven.

J-STD-033